Latest Bathroom News
-
Full bathroom remodel, part 6: installing the vanity
Installing your vanity cabinet is a major step in completing your bathroom remodel. Read these tips on shimming and advice on how to accommodate the plumbing before you start.
-
Full bathroom remodel, part 5: laying a heated tile floor
Imagine stepping out of bed and into your bathroom on a chilly winter morning and having your feet warmed by heated tiles. If you are planning a bathroom remodel, consider the pleasant possibility of a heated tile floor.
-
Full bathroom remodel, part 4: building your shower stall
The key to creating a custom shower, besides laying an attractive, smooth tile surface, is keeping water from reaching the wood. Here are step-by-step tips to guide you.
-
Full bathroom remodel, part 3: plumbing updates
Whether it is moving the drain, replacing the ABS trap, or soldering in a new water-flow control valve to your copper pipes, your project might need some plumbing alterations. Before tackling any plumbing changes, read this.
-
Full bathroom remodel, part 2: complete deconstruction
You've made a start on deconstructing your bathroom by ripping out the shower. With the right tools, a little labor and a day's worth of time, you can tear your bathroom down to the bare walls.